Davis Vantage Pro Console Manual do Utilizador Página 11

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 60
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 10
Connecting Cabled Stations
3. Replace the battery cover.
Note: To remove old batteries, see “Changing Batteries” on page 43.
Connecting Cabled Stations
Cabled Vantage Pro stations come with 100 feet (30m) of cable. Maximum
cable length from ISS to console is 1000 feet. See “Optional Accessories” on
page 3 to purchase additional cable.
1. Gently insert the console end of the 4-conductor wire into the console
receptacle marked “ISS” until it clicks into place.
WARNING:
Do not force the connector into the receptacle.
2. Ensure that the ISS cable is not twisted through the access hole.
Note: The ISS must be assembled and powered before you can test the console connection.
3. Test the connections between the ISS and the console.
Spin the wind cups and change the direction of the vane. If the ISS is
powered and the connection between the ISS and the console is correct,
you should see the wind direction and speed fields changing. Tip the rain
bucket back and forth. You should see rain registering. Also check the
outside temperature and outside humidity readings, as well as readings
for the optional solar and UV sensors, if installed in your station.
Note:
If you are installing a wireless station, you will be checking communications between your
console, ISS and any optional wireless stations when you perform the Setup Mode instructions
located in the next chapter. See “Setup Mode” on page 11.
To ISS
Vista de página 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 59 60

Comentários a estes Manuais

Sem comentários